Strategic and Transport Planning
Strategic Planning Publications
- NR2040-Appropriate-Assessment-Conclusion-Statement.pdf
- NR2040-Appropriate-Assessment-Screening-Report.pdf
- NR2040-Letter-of-Determination.pdf
- NR2040-Natura-Impact-Statement.pdf
- NR2040-SEA-Statement.pdf
- NR2040-Strategic-Flood-Risk-Assessment.pdf
- NR2040-Submission-of-the-Minister.pdf
- NR2040-Updated-SEA-ER_April-2023.pdf
- TII-NR2040-Final-Report-EN-April-2023.pdf
- TII-NR2040-Final-Report_Ire-Short-Version.pdf
- TII-NR2040-Final-Short-Report-EN-April-2023.pdf
- TII-NR2040-Final-Report_Ire-Version.pdf
- NRA-National-Road-Network-Indicators-2012.pdf
- NRA-National-Road-Network-Indicators-2013.pdf
- TII-National-Road-Network-Indicators-2014.pdf
- TII-National-Road-Network-Indicators-2015.pdf
- TII-National-Road-Network-Indicators-2016.pdf
- TII-National-Roads-Network-Indicators-2017.pdf
- TII-National-Roads-Network-Indicators-2018.pdf
- TII-National-Roads-Network-Indicators-2019.pdf
- TII-National-Roads-Network-Indicators-2020.pdf
- TII-National-Roads-Network-Indicators-2021.pdf
- TII-National-Roads-Network-Indicators-2022.pdf
- TII-National-Roads-Network-Indicators-2023.pdf
In October 2016, the NRA Project Appraisal Guidelines were superseded by the TII Project Appraisal Guidelines for National Roads. The updated guidelines cover a variety of issues including:
- Update to governance as set out in the Public Spending Code including level of appraisal at different spending thresholds
- Update to the parameters required for project appraisal as set out by Public Spending Code and Common Appraisal Framework e.g. discount rates, value of time
- Updated tools and guidance on their use to improve the capturing of benefits on schemes e.g. TUBA, COBALT
- Standard appraisal tools for Minor Projects to ensure proportionality of appraisal (PE-PAG-02035(Minor Projects €5m - €20m) and PE-PAG-02037 (Minor Projects €0.5m - €5m))
- Take cognisance of user feedback and experience gained from undertaking audits of appraisal documents to provided targeted guidance on specific issues e.g. Multi-Criteria Analysis, Model Calibration & Validation Thresholds
- Linking with update to Project Management Guidelines and associated phases
- Guidance on Motorway Service Areas
The new TII Project Appraisal Guidelines for National Roads documents can be found at www.tiipublications.ie with associated downloads available at http://www.tiipublications.ie/downloads/
- EMOS-TO1722-M50-Resilience-and-N3-to-N4-Link-Study-May-2019-(002).pdf
- EasternBypassCorridor-Protection-Study-DLR-Jan-11.pdf
- EasternBypassCorridor-Protection-StudySectorASept014.pdf
- LOR-Corridor-Protection-Study.pdf
- LOR-Feasibility-Appendix-B.pdf
- LOR-Feasibility-Study.pdf
- M11_N11_Needs_Assessment_Report.pdf
- M11_N11_Needs_Assessment_Report_Appendices.pdf
- M50-DM-Executive-Summary-April2014.pdf
- M50DemandManagementReportApril2014.pdf
- N4_N7-Corridor-Study_Feb17.pdf
- N11_Corridor_Studies.pdf
- N40-Demand-Management-Study-June-2017.pdf
- NRA-National-Roads-Traffic-Management-Study.pdf
- TII-Sustainable-Mobility-Position-Paper_Issued_231120.pdf
- TII-Briefing-Note-Public-Transport-National-Roads-V.3.0-(Draft).pdf
- A-Study-of-Lane-Capacity-in-the-Greater-Dublin-Area.pdf
- Fuel-Emissions-from-the-Car-Fleet.pdf
- Impactin-improvement-in-the-road-network.pdf
- Potential-Penetration-of-Electric-Vehicles-in-Irelands-Road-Vehicle-Fleet.pdf
- The-Employment-Benefits-of-Investment-Projects.pdf
- The-Impact-of-Fuel-Prices-on-Fuel-Consumption-and-Traffic-in-Ireland-.pdf
- Trends-in-Port-Traffic.pdf
- Trends-in-Road-Freight-Activity.pdf
- Impact-of-National-Road-Speed-Limit-Reductions-on-Greenhouse-Gas-Emissions.pdf
- Productivity-and-Agglomeration-in-Ireland.pdf